
Boiler Replacement
Marietta College
Client's Problem
- Inefficiency with an old package boiler
- High energy bills
- Unreliable operation
- Could not allow downtime of existing boiler during replacement
Morrison's Solution
Installed 2 smaller, lighter weight, high efficiency Lochinvar boilers
Maintained operation of existing boiler until changeover to new boilers in 8 hours
Increased efficiency by 28%
Improved reliability through tandem boiler redundancy